| USNS BELLATRIX |
SEATTLE |
GALVESTON TX |
$ 750,000 |
APRIL-MAY 87 |
BOILER REPAIRS |
| USNS REGULUS |
SEATTLE |
GALVESTON TX |
$ 650,000 |
SEPT-OCT 87 |
BOILER REPAIRS |
| USNS DENEBOLA |
SEATTLE |
GALVESTON TX |
$ 300,000 |
NOV-DEC 87 |
BOILER REPAIRS |
| USS WADDELL |
SAN DIEGO |
SAN DIEGO |
$ 389,000 |
MAR-MAY,1988 |
BOILER P-1 PIPING |
| USNS POLLUX |
SEATTLE |
GALVESTON TX |
$ 400,000 |
JUNE-AUG 87 |
BOILER REPAIRS |
| USS MT. VERNON |
SEATTLE |
LONG BEACH,CA |
$ 538,000 |
NOV 88-MAR 89 |
BOILER, PIPING |
| USS BARBOUR COUNTY |
SAN DIEGO |
SAN DIEGO |
$ 195,227 |
DEC 88-MAR 89 |
BOILER |
| USS HEWITT |
SAN DIEGO |
SAN DIEGO |
$ 102,000 |
FEB-MAR 89 |
BOILER |
| USS MISSOURI |
SEATTLE |
LONG BEACH, CA |
$ 480,000 |
FEB-APRIL 89 |
BOILER |
| TRANSQUEST BEAM/RAIL |
SAN DIEGO |
SAN DIEGO |
$ 97,475 |
NOV-APRIL 89 |
STRUCTURAL |
| USS DOWNES |
SAN DIEGO |
SAN DIEGO |
$ 206,000 |
MAR-MAY 89 |
BOILER |
| USS OGDEN |
SAN DIEGO |
LONG BEACH, CA |
$ 150,000 |
APRIL-MAY 89 |
BOILERS |
| USS CLEVELAND |
SAN DIEGO |
SAN DIEGO |
$ 105,000 |
FEB-MAY 89 |
BOILERS |
| USS KINCAID |
SAN DIEGO |
SAN DIEGO |
$ 3,000 |
MAY 89 |
BOILERS |
| USS DURHAM |
SAN DIEGO |
SAN DIEGO |
$ 69,926 |
MAY-JUNE 89 |
BOILERS |
| USS SAMPLE |
SAN DIEGO |
SAN DIEGO |
$ 88,554 |
MAY-AUG 89 |
BOILERS |
| USS BRADLEY |
SAN DIEGO |
SAN DIEGO |
$ 170,475 |
MAY 89-SEPT 89 |
BOILERS, PIPING |
| USCGC FIREBUSH |
SEATTLE |
SEATTLE |
$ 210,000 |
OCT 89 |
H M & E |
| USCGC WOODRUSH |
SEATTLE |
SEATTLE |
$ 210,000 |
NOV 89 |
HM&E |
| USCGC SASSAFRAS |
SEATTLE |
SEATTLE |
$ 210,000 |
DEC 89 |
HM&E |
| USS KIRK |
SEATTLE |
SEATTLE |
$ 375,000 |
JULY 89-JAN 90 |
BOILERS |
| USS SACRAMENTO |
SEATTLE |
SEATTLE |
$ 350,000 |
SEPT 89-JAN 90 |
BOILERS |
| USS DULUTH |
SAN DIEGO |
SAN DIEGO |
$ 329,019 |
JAN 90-JUNE 90 |
BOILERS |
| USS NEW ORLEANS |
SAN DIEGO |
SAN DIEGO |
$ 99,338 |
OCT 89-JAN 90 |
BOILERS |
| USS PEORIA |
SAN DIEGO |
SAN DIEGO |
$ 189,882 |
OCT 89-JAN 90 |
BOILERS |
| USS REASONER |
SAN DIEGO |
SAN DIEGO |
$ 35,736 |
MAR-JULY 90 |
BOILERS |
| S/L PACIFIC |
SEATTLE |
PORTLAND, OR |
$ 370,214 |
OCT 90-NOV 90 |
BOILERS, PIPING |
| S/L NAVIGATOR |
SEATTLE |
PORTLAND, OR |
$ 447,258 |
DEC 90-FEB 91 |
BOILERS, PIPING |
| S/L TRADER |
SEATTLE |
PORTLAND,OR |
$ 335,307 |
JAN 91-APRIL 91 |
BOILERS, PIPING |
| VIKING SERENADE |
SAN DIEGO |
SAN DIEGO |
$ 1,115,497 |
FEB-APRIL 91 |
HULL |
| USS INDEPENDENCE |
SAN DIEGO |
SAN DIEGO |
$ 391,156 |
APRIL-MAY 91 |
HULL |
| USS FT. MC HENRY |
SAN DIEGO |
SAN DIEGO |
$ 160,000 |
MAY-AUG 91 |
DISTILLERS |
| USS DURHAM |
SAN DIEGO |
SAN DIEGO |
$ 422,000 |
JUNE-AUG 91 |
BOILERS/AUXILIARY |
| USS ACADIA |
SAN DIEGO |
SAN DIEGO |
$ 298,000 |
JUNE-AUG 91 |
BOILERS, AUXILIARIES |
| USS MT. RUSHMORE |
SAN DIEGO |
SAN DIEGO |
$ 226,196 |
SEPT-OCT 91 |
PIPING, BOILERS |
| SS DAWN PRINCESS |
SEATTLE |
SEATTLE |
$ 1,700,000 |
SEPT-OCT 91 |
STEEL, CASINGS, STACKS |
| USS STERETT |
SAN DIEGO |
SAN DIEGO |
$ 4,000,000 |
SEPT 91-AUG 92 |
H M & E |
| USS EX-STRAUSS |
SAN DIEGO |
SAN DIEGO |
$ 1,500,000 |
JAN 92-DEC 92 |
BOILERS |
| USNS ALGOL |
SEATTLE |
MOBILE,AL |
$ 1,000,000 |
JAN 92-MAR 92 |
BOILERS |
| USNS ANTARES |
SEATTLE |
JACKSONVILLE FL |
$ 1,500,000 |
FEB 92-JUN 92 |
BOILERS |
| BALTIMORE TRADER |
SEATTLE |
MOBILE AL |
$ 320,000 |
MAY 92-JUN 92 |
BOILERS |
| USS WADDELL |
SAN DIEGO |
SAN DIEGO |
$ 200,000 |
JUNE 92 |
BOILERS |
| USS CLEVELAND |
SAN DIEGO |
SAN DIEGO |
$ 685,344 |
JULY 92-NOV 92 |
BOILERS |
| SS TEXAS TRADER |
SEATTLE |
MOBILE AL |
$ 63,805 |
AUG 92-OCT 92 |
BOILERS |
| AMERICAN TRADER |
SEATTLE |
MOBILE AL |
$ 100,000 |
JULY 92 |
BOILERS |
| SS CAPE BORDA |
PORTLAND |
PORTLAND OR |
$ 111,000 |
SEPT 92-OCT 93 |
BOILERS |
| USS CALLAGHAN |
SAN DIEGO |
SAN DIEGO |
$ 75,714 |
OCT 92-NOV 92 |
AUXILIARIES |
| USS CORONADO |
SAN DIEGO |
SAN DIEGO |
$ 386,115 |
SEPT 92-JAN 93 |
BOILERS |
| USS DULUTH |
SAN DIEGO |
SAN DIEGO |
$ 104,953 |
OCT 92-JAN 93 |
BOILERS |
| USS HARRY HILL |
SAN DIEGO |
SAN DIEGO |
$ 62,854 |
OCT 92-JAN 93 |
BOILERS |
| USS VINCENNES |
SAN DIEGO |
SAN DIEGO |
$ 253,866 |
OCT 92-JAN 93 |
BOILERS |
| SS CAPE BOVER |
PORTLAND OR |
PORTLAND OR |
$ 110,888 |
NOV 92-JAN 93 |
BOILERS |
| SS CAPE GIRARDEAU |
SAN DIEGO |
SAN PEDRO CA |
$ 466,342 |
NOV 92-APR 93 |
BOILERS |
| USS FORT MCHENRY |
SAN DIEGO |
SAN DIEGO |
$ 89,090 |
DEC 92-MAY 93 |
DISTILLER |
| SS AIDE |
SAN DIEGO |
SAN DIEGO |
$ 322,113 |
DEC 92-MAY 93 |
BOILERS |
| SS NORTHERN LIGHTS |
MOBILE AL |
MOBILE AL |
$ 36,000 |
DEC 92-FEB 93 |
P-1 PIPING |
| SS ST.LUCIA |
SEATTLE |
PORT ANGELES WA |
$ 285,000 |
DEC 92-JAN 93 |
BOILERS |
| S/L RELIANCE |
SEATTLE |
YOKOHAMA, JAPAN |
$ 130,000 |
DEC 92-JAN 93 |
BOILERS |
| S/L TRADER |
SEATTLE |
TAIWAN, R.O.C. |
$ 50,000 |
DEC 92-JAN 93 |
BOILERS |
| S/L ENTERPRISE |
SEATTLE |
TAIWAN, R.O.C. |
$ 60,000 |
DEC 92-JAN 93 |
BOILERS |
| S/L NAVIGATOR |
SEATTLE |
TAIWAN, R.O.C. |
$ 50,000 |
DEC 92-JAN 93 |
BOILERS |
| S/L PACIFIC |
SEATTLE |
TAIWAN, R.O.C. |
$ 140,000 |
DEC 92-JAN 93 |
BOILERS |
| S/L SPIRIT |
SEATTLE |
TAIWAN, R.O.C. |
$ 167,000 |
DEC 92-JAN 93 |
BOILERS |
| USCGC POLAR STAR |
SEATTLE |
SEATTLE |
$ 59,377 |
JAN 93-JUNE 93 |
DISTILLER |
| SS AGENT |
SAN DIEGO |
LONG BEACH CA |
$ 817,098 |
FEB 93-NOV 93 |
BOILERS |
| SS AMBASSADOR |
SAN DIEGO |
SAN DIEGO |
$ 988,650 |
FEB 93-DEC 93 |
BOILERS |
| USS CONSTITUTION |
SEATTLE |
HONOLULU, HI |
$ 106,664 |
MAR 93-JUNE 93 |
BOILERS |
| JORE CORPORATION |
SEATTLE |
SEATTLE |
$ 84,936 |
MAR 93-JUNE 93 |
HULL |
| EXXON BENECIA |
PORTLAND |
PORTLAND OR |
$ 111,249 |
MAY 93-JULY 93 |
BOILERS |
| S/L DISCOVERY |
SEATTLE |
NORFOLK VA |
$ 114,667 |
MAY 93-JUNE 93 |
H M & E |
| USS JOUETT |
SAN DIEGO |
SAN DIEGO |
$ 412,598 |
APR 93-JULY 93 |
BOILERS |
| USNS JASON |
SAN DIEGO |
SAN DIEGO |
$ 66,500 |
JULY 93-AUG 93 |
BOILERS |
| USNS RUSHMORE |
SAN DIEGO |
SAN DIEGO |
$ 171,672 |
JULY 93-OCT 93 |
BOILERS |
| USCGC POLAR STAR |
SEATTLE |
SEATTLE |
$ 567,751 |
OCT 93-DEC 93 |
H M & E |
| FDA BUILDING |
SEATTLE |
SEATTLE |
$ 230,000 |
OCT 93-APRIL 94 |
HVAC |
| USNS SAN JOSE |
SAN DIEGO |
SAN DIEGO |
$ 204,056 |
NOV 93-APR 94 |
BOILERS |
| USS CAPE COD |
SAN DIEGO |
SAN DIEGO |
$ 76,999 |
NOV 93-JAN 94 |
BOILERS |
| S/L CONSUMER |
SEATTLE |
YOKOHAMA JAPAN |
$ 525,000 |
DEC 93-JAN 94 |
BOILERS |
| S/L PRODUCER |
SEATTLE |
YOKOHAMA JAPAN |
$ 250,000 |
DEC 93-JAN 94 |
BOILERS |
| USNS SAN JOSE |
SAN DIEGO |
SAN DIEGO |
$ 217,000 |
DEC 93-JAN 94 |
H M & E |
| NOAA MILLER FREEMAN |
SEATTLE |
SEATTLE |
$ 122,084 |
DEC 93-MAR 94 |
H M & E |
| NOAA SHIP RAINIER |
SEATTLE |
SEATTLE |
$ 246,875 |
JAN 93-MAR 94 |
H M & E |
| S/L ANCHORAGE |
SEATTLE |
PORTLAND |
$ 63,127 |
JAN 93-FEB 94 |
REPLACE WASTE HEAT BOILER |
| M/V LAURA MAERSK |
SAN DIEGO |
SAN DIEGO |
$ 174,523 |
JAN 94-MAY 94 |
HEAT EXCHANGERS |
| NOAA SHIP MCARTHUR |
SEATTLE |
SEATTLE |
$ 88,280 |
FEB 93-MAR 94 |
H M & E |
| KAISER ENGINEERS |
SEATTLE |
HANFORD, WA |
$ 1,710,816 |
FEB 94-FEB 95 |
DESIGN/BUILD POWER PLANT |
| USS NIMITZ |
SEATTLE |
BREMERTON |
$ 3,300,000 |
MAR 94-JAN 95 |
H M & E |
| USS WILLAMETTE |
SEATTLE |
HONOLULU, HI |
$ 1,890,141 |
MAR 94-JUL 94 |
H M & E, SEARCH RADAR, RADIO |
| USS DENVER |
SAN DIEGO |
SAN DIEGO |
$ 680,000 |
APR 94-AUG 94 |
BOILER REPAIRS |
| POLAR STAR |
SEATTLE |
SEATTLE |
$ 156,000 |
MAY 94-JUL 94 |
BOILER CASINGS |
| USS COMSTOCK |
SAN DIEGO |
SAN DIEGO |
$ 306,000 |
JUN 94-JUL 94 |
BOILER REPAIRS |
| SS KENAI |
PORTLAND,OR |
PORTLAND,OR |
$ 100,000 |
JUN 94-JUN 94 |
BOILER REPAIRS |
| SS NO. SLOPE |
PORTLAND, OR |
PORTLAND,OR |
$ 98,000 |
JUN 94-JUN 94 |
BOILER REPAIRS |
| USS KITTY HAWK |
SAN DIEGO |
SAN DIEGO |
$ 83,691 |
JUNE 94-JUL 94 |
H M & E |
| USS DULUTH |
SAN DIEGO |
SAN DIEGO |
$ 600,000 |
SEP 94-DEC 94 |
BOILER REPAIRS/PIPING |
| SS CHERRY VALLEY |
MOBILE, AL |
MOBILE, AL |
$ 250,000 |
SEP 94-SEP 94 |
BOILER REPAIRS |
| SS ATIGUN PASS |
PORTLAND |
PORTLAND |
$ 91,429 |
SEP 94-SEP 94 |
BOILER REPAIRS |
| USCGC MELLON |
SEATTLE |
SEATTLE |
$ 376,000 |
NOV 94-DEC 94 |
H M & E |
| USS EX COOK |
SAN DIEGO |
LONG BEACH |
$ 1,650,000 |
NOV 94-FEB 95 |
BOILER REPAIRS/PIPING |
| SS HUMACAO |
MOBILE, AL |
MOBILE, AL |
$ 250,000 |
DEC 94-FEB 95 |
BOILER REPAIRS |
| USS RUSHMORE |
SAN DIEGO |
SAN DIEGO |
$ 100,000 |
FEB 95-PRESENT |
BOILER REPAIRS |
| USS FORD |
SEATTLE |
SEATTLE |
$ 76,500 |
FEB 95-MAR 95 |
H M & E |
| USCG JARVIS |
SEATTLE |
HONOLULU |
$ 221,000 |
JAN 95-FEB 95 |
H M & E |
| USCG RUSH |
SEATTLE |
HONOLULU |
$ 444,300 |
FEB 95-MAR 95 |
H M & E |
| USS FT McHENRY |
SAN DIEGO |
SAN DIEGO |
$ 85,000 |
FEB 95-MAR 95 |
BOILER REPAIRS |
| USS NIMITZ |
SEATTLE |
SEATTLE |
$ 1,000,000 |
MAY 95-JUNE 95 |
H M & E |
| SS DENEBULA |
MOBILE, AL |
MOBILE, AL |
$ 1,111,000 |
JUNE 95-JULY 95 |
BOILER REPAIRS |
| USS CONSTELLATION |
SAN DIEGO |
SAN DIEGO |
$ 500,000 |
JUNE 95-SEPT 95 |
BOILER REPAIRS |
| HS
FORMION |
SEATTLE |
ATHENS, GREECE |
$ 380,000 |
MAR 95-JUNE 95 |
BOILER REPAIRS |
| S/L EXPEDITION |
SEATTLE |
NEWPORT NEWS, VA |
$ 250,000 |
JUNE 95-JULY 95 |
BOILER REPAIRS |
| USS CORONADO |
SAN DIEGO |
SAN DIEGO |
$ 500,000 |
JULY 95-NOV 95 |
BOILER REPAIRS |
| USS ESSEX |
SAN DIEGO |
SAN DIEGO |
$ 300,000 |
JUNE 95-AUG 95 |
BOILER REPAIRS |
| S/L BENICIA |
PORTLAND |
PORTLAND |
$ 230,000 |
JUNE 95-JULY 95 |
H, M & E |
| S/L SPIRIT |
SEATTLE |
SAN FRANCISCO |
$ 250,000 |
AUG 95 |
BOILER REPAIRS |
| OVERSEAS JUNEAU |
PORTLAND |
PORTLAND |
$ 150,000 |
AUG-SEPT 95 |
BOILER REPAIRS |
| CAPE ISLAND |
SEATTLE |
SEATTLE |
$ 160,000 |
AUG-SEPT 96 |
BOILERREPAIR |
| USS OGDEN |
SAN DIEGO |
SAN DIEGO |
$ 600,000 |
SEPT ‘95-MARCH ‘96 |
BOILERREPAIR |
| 5 SEALAND SHIPS |
SEATTLE |
HONG KONG |
$ 1,363,898 |
JAN-MARCH 96 |
BOILERREPAIR |
| USS FORT FISHER |
SAN DIEGO |
SAN DIEGO |
$ 769,000 |
NOV 95-MARCH 96 |
BOILER REPAIR |
| CHELSEA |
MOBILE |
MOBILE |
$ 105,772 |
NOV 95-MARCH 96 |
BOILER REPAIR |
| USCG RUSH |
SEATTLE |
HONOLULU |
$ 144,558 |
DEC 95-MARCH 96 |
H,M & E |
| USS KITTYHAWK |
SAN DIEGO |
SAN DIEGO |
$ 164,830 |
DEC 95- MARCH 96 |
BOILER REPAIR |
| S/L CHALLENGER |
SEATTLE |
SAN FRANSISCO |
$ 397,547 |
DEC 95-JAN 96 |
BOILER |
| CAPE INTREPID |
SEATTLE |
TACOMA |
$ 126,113 |
JAN 96-MARCH 96 |
BOILERS |
| S/L HAWAII |
MOBILE |
MOBILE |
$ 223,364 |
JAN 96 |
BOILERS |
| O/V NEW YORK |
PORTLAND |
PORTLAND |
$ 106,720 |
FEB-MARCH 96 |
BOILERS |
| USS NEW ORLEANS |
SAN DIEGO |
SAN DIEGO |
$ 120,000 |
MARCH-APRIL |
BOILERS |
| O/S JOYCE |
SAN DIEGO |
LONG BEACH |
$ 161,049 |
APRIL 96 |
BOILERS |
| USS FOSTER |
SEATTLE |
EVERETT |
$ 85,000 |
APRIL-MAY 96 |
H,M & E |
| USS JUNEAU |
SAN DIEGO |
SAN DIEGO |
$ 588,776 |
MAY-AUG 96 |
BOILERS |
| USS ANCHORAGE |
SAN DIEGO |
SAN DIEGO |
$ 568,000 |
JUNE-NOV 96 |
BOILERS |
| FITZGERALD |
SAN DIEGO |
SAN DIEGO |
$ 210,000 |
JULY-AUG 96 |
BOILERS |
| USS FORD PRAV I |
SEATTLE |
EVERETT |
$ 1,000,000 |
JULY-AUG 96 |
H,M & E |
| USS FORD PRAV II |
SEATTLE |
EVERETT |
$ 2,000,000 |
AUG-OCT 96 |
H,M & E |
| USCGC MIDGET |
SEATTLE |
SEATTLE |
$ 498,000 |
SEPT-OCT 96 |
H,M & E |
| USS DENVER |
SAN DIEGO |
SAN DIEGO |
$ 220,000 |
OCT 96-FEB 97 |
BOILERS |
| COASTAL EAGLE POINT |
MOBILE |
VERA CRUZ |
$ 165,000 |
OCT 96 |
BOILERS |
| OLDENDORF |
SAN DIEGO |
SAN DIEGO |
$ 450,000 |
OCT 96-MARCH 97 |
BOILERS |
| VINCENNES |
SAN DIEGO |
SAN DIEGO |
$ 240,000 |
NOV 96-JAN 97 |
BOILERS |
| BENFOLD |
SAN DIEGO |
SAN DIEGO |
$ 228,000 |
NOV 96-JAN 97 |
CORROSION SHIP ALT |
| USS RAY |
SEATTLE |
EVERETT |
$ 12,000 |
DEC 96-JAN 97 |
H,M & E |
| USCG GALVESTON ISLAND |
SEATTLE |
GUAM |
$ 620,000 |
JAN 97-MARCH 97 |
H,M & E |
| USS FOSTER |
SEATTLE |
EVERETT |
$ 140,000 |
JAN 97-FEB 97 |
H,M & E |
| USS SHILO |
SAN DIEGO |
SAN DIEGO |
$ 202,000 |
FEB 97 - JULY 97 |
BOILER REPAIR |
| USS CHANCELLORSVILLE |
SAN DIEGO |
SAN DIEGO |
$ 331,000 |
MAR 97 - FEB 98 |
BOILER REPAIR |
| USS KITTYHAWK |
SAN DIEGO |
SAN DIEGO |
$ 2,000,000 |
MAR 97 - JAN 98 |
BOILER REPAIR |
| USS MCKEE |
SAN DIEGO |
SAN DIEGO |
$ 137,500 |
APR 97 - JULY 97 |
BOILER REPAIR |
| USS STEPHAN GROVES |
MOBILE |
PASGAGULA |
$ 1,800,000 |
APR 97 - JULY 97 |
H M & E |
| O/S CHICAGO |
PORTLAND |
PORTLAND |
$ 184,500 |
APR 97 - JUNE 97 |
BOILER REPAIR |
| S/R BENICIA |
PORTLAND |
PORTLAND |
$ 234,300 |
JUNE 97 - SEPT 97 |
BOILER REPAIR |
| USS MILIUS |
SAN DIEGO |
SAN DIEGO |
$ 121,500 |
JUNE 97 - DEC 97 |
BOILER REPAIR |
| S/L EXPEDITION |
SEATTLE |
NORFOLK, VA |
$ 405,000 |
JULY 97 - SEPT 97 |
BOILER REPAIR |
| USS PELELIU |
SAN DIEGO |
SAN DIEGO |
$ 202,900 |
AUG 97 - SEPT 97 |
BOILER REPAIR |
| HMTS NAPHALAI (EX-OULETT) |
PORTLAND |
PORTLAND |
$ 2,100,000 |
AUG 97 - MAY 98 |
BOILER REPAIR |
| SS MAUI |
SEATTLE |
SAN FRANCISCO |
$ 220,500 |
OCT 97 - DEC 97 |
BOILER REPAIR |
| SS CHILBAR |
MOBILE |
CHARLESTON, SC |
$ 119,700 |
SEPT 97 - NOV 97 |
BOILER REPAIR |
| S/L DISCOVERY |
SEATTLE |
SAN FRANCISCO |
$ 142,800 |
SEPT 97 - DEC 97 |
BOILER REPAIR |
| S/L NAVIGATOR |
SEATTLE |
ULSAN, KOREA |
$ 260,000 |
OCT 97 - NOV 97 |
BOILER REPAIR |
| S/L TRADER |
SEATTLE |
ULSAN, KOREA |
$ 192,600 |
NOV 97 - DEC 97 |
BOILER REPAIR |
| S/L ENTERPRISE |
SEATTLE |
ULSAN, KOREA |
$ 437,500 |
JAN 98 - FEB 98 |
BOILER REPAIR |
| SS KAUI |
SEATTLE |
SAN FRANCISCO |
$ 337,800 |
DEC 97 - FEB 98 |
BOILER REPAIR |
| S/L SPIRIT |
SEATTLE |
ULSAN, KOREA |
$ 208,000 |
DEC 97 - JAN 98 |
BOILER REPAIR |
| USS OGDEN |
SAN DIEGO |
SAN DIEGO |
$ 560,000 |
DEC 97 - MAY 98 |
BOILER REPAIR |
| USS JOHN PAUL JONES |
SAN DIEGO |
SAN DIEGO |
$ 266,000 |
JAN 98 - MAY 98 |
BOILER REPAIR |
| S/L PACIFIC |
SEATTLE |
ULSAN, KOREA |
$ 430,000 |
FEB 98 - MAR 98 |
BOILER REPAIR |
| SS MAYAGUEZ |
SEATTLE |
NEW YORK |
$ 388,800 |
MAR 98 - MAY 98 |
BOILER PIPE & VALVES |
| USS PELELIU |
SAN DIEGO |
SAN DIEGO |
$ 113,025 |
MAR 98 - AUG 98 |
BOILER REPAIR |
| DENEBOLA |
MOBILE |
MOBILE, AL |
$ 112,445 |
MAY 98 - JULY 98 |
BOILER REPAIR |
| O/S BOSTON |
PORTLAND |
PORTLAND, OR |
$ 436,073 |
MAY 98 - OCT 98 |
BOILER REPAIR |
| SS HUMACAO |
SEATTLE |
BALTIMORE, MD |
$ 314,711 |
JUNE 98 - SEPT 98 |
BOILER REPAIR |
| NORTH SLOPE |
PORTLAND |
PORTLAND, OR |
$ 168,298 |
JUNE 98 - AUG 98 |
BOILER REPAIR |
| USS BUNKER HILL |
SAN DIEGO |
SAN DIEGO, CA |
$ 564,000 |
OCT 98 - JUNE 99 |
H,M & E |
| MT. JULIUS |
MOBILE |
MOBILE, AL |
$ 116,000 |
JULY 98 - OCT 98 |
BOILER REPAIR |
| S/L CONSUMER |
BALTIMORE |
NORFOLK, VA |
$ 458,775 |
JULY 98 - JAN 99 |
BOILER REPAIR |
| USS HUMACAO |
BALTIMORE |
BALTIMORE, MD |
$ 198,083 |
JULY 98 - NOV 98 |
BOILER REPAIR |
| KAINALU |
PORTLAND |
PORTLAND, OR |
$ 684,745 |
AUG 98 - MAR 99 |
BOILER REPAIR |
| GUYAMA |
MOBILE |
MOBILE, AL |
$ 237,611 |
MAY 98 - DEC 98 |
BOILER REPAIR |
| CHEMICAL PIONEER |
MOBILE |
MOBILE, AL |
$ 291,040 |
AUG 98 - APRIL 99 |
BOILER REPAIR |
| KAIMOKU |
PORTLAND |
SAN FRANSISCO |
$ 229,237 |
AUG 98 - NOV 98 |
BOILER REPAIR |
| USS CORANODO |
SAN DIEGO |
SAN DIEGO, CA |
$ 219,902 |
SEPT 98 - DEC 98 |
H,M & E |
| LURLINE |
SEATTLE |
ULSAN, KOREA |
$ 685,651 |
OCT 98 - JAN 99 |
BOILER REPAIR |
| S/L PRODUCER |
MOBILE |
MOBILE, AL |
$ 860,059 |
DEC 98 - APRIL 99 |
BOILER REPAIR |
| USS VALLEY FORGE |
SAN DIEGO |
SAN DIEGO, CA |
$ 441,884 |
JAN 99 - MAY 99 |
H,M & E |
| USS COWPENS |
SAN DIEGO |
SAN DIEGO, CA |
$ 500,000 |
MAR 99 - JUNE 99 |
H,M & E |
| S/L CHALLENGER |
SEATTLE |
ULSAN, KOREA |
$ 601,000 |
JAN 99 - JUNE 99 |
BOILER REPAIR |
| LNG SOUTHERN |
BALTIMORE |
NORFOLK, VA |
$ 1,150,000 |
FEB 99 - CURRENT |
BOILER REPAIR |
| OBERSERVATION ISLAND |
PORTLAND |
PORTLAND, OR |
$ 126,917 |
MAR 99 - JUNE 99 |
PIPING |
| B & D BOILER |
SAN DIEGO |
CHARLESTON, SC |
$ 180,000 |
MAR 99 - MAY 99 |
BOILER REPAIR |
| DULUTH |
SAN DIEGO |
SAN DIEGO, CA |
$ 380,000 |
MAR 99 - JUNE 99 |
BOILER REPAIR |
| EL YUNKQUE |
MOBILE |
MOBILE, AL |
$ 330,353 |
MAR 99 - MAY 99 |
BOILER REPAIR |
| O/S NEW YORK |
PORTLAND |
PORTLAND, OR |
$ 207,136 |
APRIL 99 - JUNE 99 |
BOILER REPAIR |
| USS CAMDEN (AOE-2) * |
SEATTLE |
SEATTLE, WA |
$ 501,000 |
APRIL 99 - SEPT 99 |
BOILER REPAIR |
| S/L NAVIGATOR |
SEATTLE |
VANCOUVER, BC |
$ 100,000 |
APRIL 99 - JUNE 99 |
BOILER REPAIR |
| USS FIFE (DD-991) ** |
SEATTLE |
BREMERTON WA |
$ 285,680 |
OCT 99 - DEC 99 |
BOILER REPAIR |
| S/L RELIANCE |
SEATTLE |
TACOMA WA |
$ 295,294 |
|
BOILER REPAIR |
| USS THOMAS GATES |
AL |
|
$ 124,272 |
|
BOILER REPAIR |
| USS KINCAID |
CA |
SAN DIEGO |
$333,426.00 |
|
BOILER REPAIR |
| S/L HAWAII |
WA |
KOREA |
$ 331,411 |
|
BOILER REPAIR |
| O/S CHICAGO |
OR |
|
$ 300,305 |
FEB 00 - APRIL 00 |
BOILER REPAIR |
| GALLEOMA |
VA |
|
$ 116,975 |
|
BOILER REPAIR |
| USNS MERCY |
OR |
SAN FRANSISCO |
$ 207,625 |
|
BOILER REPAIR |
| POWER BARGE |
OR |
PORTLAND OR |
$ 450,873 |
|
BOILER REPAIR |
| CAPE GIRARDEAU |
OR |
OREGON |
$ 218,770 |
FEB 00 - APRIL 00 |
BOILER REPAIR |
| POLAR SEA |
WA |
SEATTLE WA |
$ 292,762 |
MAR 00 - 06 00 |
BOILER REPAIR |
| S/L EXPEDITION |
WA |
KOREA |
$ 384,308 |
|
BOILER REPAIR |
| GEM STATE |
OR |
SAN FRANSISCO |
$ 699,760 |
MAR 00 - |
BOILER REPAIR |
| SS BEAVER STATE |
WA |
BREMERTON WA |
$ 221,958 |
MAR 00 - |
BOILER REPAIR |
| HUMACAO |
AL |
|
$ 299,743 |
|
BOILER REPAIR |
| KISKA |
CA |
|
$ 304,383 |
|
BOILER REPAIR |
| ESPERANZA |
OR |
OREGON |
$ 121,381 |
APR 00 - |
PIPE SECTIONS |
| MAYAGUEZ |
AL |
|
$ 307,784 |
|
BOILER REPAIR |
| SEA RIVER BAYTOWN |
OR |
SAN FRANSISCO |
$ 180,800 |
|
BOILER REPAIR |
| SS BEAVER STATE |
WA |
OLYMPIA WA |
$ 937,458 |
JULY 00 - |
BOILER REPAIR |
| CAPE FEAR |
OR |
OAKLAND |
$ 1,167,856 |
JULY 00 - |
BOILER REPAIR |
| CAPE JOHN |
AL |
VIOLET, LA |
$ 278,740 |
JULY 00 - |
BOILER REPAIR |
| CSX DISCOVERY |
WA |
OAKLAND, CA |
$ 256,964 |
SEPT 00 - |
BOILER REPAIR |
| MATSONIA |
OR |
OAKLAND |
$ 998,882 |
SEPT 00 - |
BOILER REPAIR |
| CSX PACIFIC |
WA |
SINGAPORE |
$ 445,247 |
|
BOILER REPAIR |
| USS FIFE (DD-991) ** |
WA |
WASHINGTON |
$ 267,496 |
JAN 01 - |
BOILER REPAIR |
| CSX CONSUMER |
WA |
SINGAPORE |
$ 469,893 |
FEB 01 - |
BOILER REPAIR |
| USS THOMAS GATES |
AL |
ALABAMA |
$ 185,706 |
FEB 01 - |
BOILER REPAIR |
| SS GOPHER STATE |
VA |
SOUTH CAROLINA |
$ 386,699 |
MAR 01 |
BOILER REPAIR |
| USS CAMDEN (AOE-2) * |
WA |
SEATTLE WA |
$ 476,046 |
MAR 01 |
BOILER REPAIR |
| CSX CHALLENGER |
WA |
SINGAPORE |
$ 315,072 |
MAY 01 - MAY 01 |
BOILER REPAIR |
| CHEMICAL PIONEER |
VA |
VIRGINIA |
$ 199,120 |
APR 01 |
BOILER REPAIR |
| CSX PRODUCER |
WA |
OLYMPIA WA |
$ 385,354 |
MAR 01 |
BOILER REPAIR |
| CAROLINA |
VIGINIA |
PHILADELPHIA |
$
259,710 |
JUL 01 - SEPT 01 |
BOILER REPAIR |
| SS
MATEJ KOLAK |
VA |
VIRGINIA |
$
1,287,323 |
AUG 01 |
BOILER REPAIR |
| SS
ANZIO |
VA |
VIRGINIA |
$
365,160 |
AUG 01 |
BOILER REPAIR |
| SS
POTOMAC |
AL |
ALABAMA |
$
232,566 |
AUG 01 |
BOILER REPAIR |
| SS
METEOR |
OR |
OREGON |
$
176,241 |
AUG 01 |
BOILER REPAIR |
| USS
CONSTELLATION |
CA |
CALIFORNIA |
$
1,317,484 |
SEPT 01 |
BOILER REPAIR |
| USS
STUMP |
VA |
VIRGINIA |
$
352,432 |
OCT 01 |
BOILER REPAIR |
| USS
KINCAID |
CA |
CALIFORNIA |
$
309,038 |
DEC 01 - MAR 02 |
BOILER REPAIR |
| CSX
TRADER |
WA |
SINGAPORE |
$
335,006 |
NOV 01 |
BOILER REPAIR |
| CSX
NAVIGATOR |
WA |
|
$
351,064 |
|
BOILER REPAIR |
| SS MAUI |
WA |
WASHINGTON |
$
186,387 |
DEC 01 |
BOILER REPAIR |
| USS
GUAYAMA |
VA |
PHILADELPHIA |
$
291,510 |
DEC 01 |
BOILER REPAIR |
| CHIEF
GADAO |
OR |
OREGON |
$
100,369 |
JAN 02 |
BOILER REPAIR |
| MARINE
CHEMIST |
VA |
VIRGINIA |
$
259,530 |
FEB 02 |
BOILER REPAIR |
| SS CAPE
FEAR |
OR |
ALAMEDA, CA |
$
551,654 |
FEB 02 |
BOILER REPAIR |
| CSX
HAWAII |
VA |
PORTUGAL |
$
299,900 |
APR 02 - JUN 02 |
BOILER REPAIR |
| SS
HITCHENBROOK |
OR |
VICTORIA CANADA |
$
146,498 |
APR 02 - JUN 02 |
BOILER REPAIR |
| CSX
EXPEDITION |
WA |
SINGAPORE |
$
331,941 |
|
BOILER REPAIR |
| CORN
HUSKER |
VA |
VIRGINIA |
$
201,188 |
OCT 02 |
BOILER REPAIR |
| SS
MAYAGUEZ |
VA |
|
$
137,726 |
AUG 02 |
BOILER REPAIR |
| CSX
DISCOVERY |
VA |
PORTUGAL |
$
329,121 |
|
BOILER REPAIR |
| MANULANI |
OR |
RICHMOND,
CA |
$
143,284 |
SEPT 02 |
BOILER REPAIR |
| USS
YORKTOWN |
AL |
ALABAMA |
$
265,000 |
OCT 02 |
BOILER REPAIR |
| SL-7
ALTAIR |
VA |
VIRGINIA |
$
200,000 |
NOV 02 |
BOILER REPAIR |
| CSX
NAVIGATOR |
WA |
SINGAPORE |
$
437,472 |
NOV 01 - FEB 02 |
BOILER REPAIR |
| CSX
TRADER |
WA |
SINGAPORE |
$
336,133 |
NOV 01 - MAR 02 |
BOILER REPAIR |
| MATSON
MAUI |
WA |
WASHINGTON |
$
180,387 |
DEC 01 - JAN 02 |
BOILER REPAIR |
| CHIEF
GADAO |
OR |
OAKLAND |
$
100,369 |
JAN 02 - MAR 02 |
BOILER REPAIR |
| CAPE
FEAR |
OR |
ALAMEDA |
$
551,654 |
FEB 02 - APR 02 |
BOILER REPAIR |
| CSX
HAWAII |
VA |
PORTUGAL |
$ 299,900 |
MAR 02 - MAY 02 |
BOILER REPAIR |
| HITTCHENBROOK |
OR |
OREGON |
$ 146,498 |
MAR 02 - MAY 02 |
BOILER REPAIR |
| EXPEDITION |
WA |
SINGAPORE |
$ 331,941 |
MAY 02 - JUNE 02 |
BOILER REPAIR |
| USS OLDENEDORF |
CA |
CALIFORNIA |
$ 219,221 |
JUNE 02 - JULY 02 |
BOILER REPAIR |
| CORNHUSKER |
VA |
VIRGINIA |
$ 209,188 |
JUNE 02 - AUG 02 |
BOILER REPAIR |
| SS MAYAGUEZ |
VA |
VIRGINIA |
$ 137,726 |
JUNE 02 - JULY 02 |
BOILER REPAIR |
| MILITARY SEALIFT |
CA |
CALIFORNIA |
$ 140,621 |
JULY 02 - AUG 02 |
BOILER REPAIR |
| CSX DISCOVERY |
VA |
PORTUGAL |
$ 329,116 |
AUG 02 - SEPT 02 |
BOILER REPAIR |
| MANULANI |
OR |
RICHMOND, CA |
$ 143,284 |
SEPT 02 - OCT 02 |
BOILER REPAIR |
| YORKTOWN |
AL |
ALABAMA |
$ 281,630 |
OCT 02 - NOV 02 |
BOILER REPAIR |
| SL-7 POLLUX |
VA |
VIOLET, LA |
$ 134,590 |
NOV 02 - DEC 02 |
BOILER REPAIR |
| USNS SHASTA |
CA |
CALIFORNIA |
$ 176,512 |
NOV 02 - JAN 03 |
BOILER REPAIR |
| USS KENNEDY |
WA |
FLORIDA |
$11,000,000 |
DEC 02 - DEC 03 |
BOILER REPAIR |
| CSX CRUSADER |
VA |
VIRGINIA |
$ 306,641 |
JAN 03 - FEB 03 |
BOILER REPAIR |
| CSX PACIFIC ASIA |
WA |
|
$ 519,686 |
DEC 02 - FEB 03 |
BOILER REPAIR |
| CSX ENTERPRISE ASIA |
WA |
|
$ 494,284 |
DEC 02 - FEB 03 |
BOILER REPAIR |
| USCG CHASE |
CA |
CALIFORNIA |
$ 258,605 |
DEC 02 - FEB 03 |
BOILER REPAIR |
| USS BELLEAU WOOD |
CA |
CALIFORNIA |
$ 292,197 |
FEB 03 - MAR 03 |
BOILER REPAIR |
| METEOR |
OR |
OREGON |
$ 330,000 |
FEB 03 - MAR 03 |
BOILER REPAIR |
| HORIZON CONSUMER |
WA |
WASHINGTON |
$ 337,194 |
MAY 03 - JUNE 03 |
BOILER REPAIR |
| HORIZON TRADER |
WA |
OAKLAND, CA |
$ 280,941 |
MAY 03 - JUNE 03 |
BOILER REPAIR |
| USS CAMDEN |
WA |
WASHINGTON |
$ 400,981 |
JULY 03 - AUG 03 |
BOILER REPAIR |
| KITTYHAWK |
CA |
JAPAN |
$ 818,923 |
JULY 03 - AUG 03 |
BOILER REPAIR |
| USS
LURLINE |
WA |
CHINA |
|